logo
Home ProductsHDPE Geocell

Mine Dump Slope Geocell 100mm GM356 HDPE Topsoil Cover for Rehabilitation

Certification
China Anhui Huifeng New Synthetic Materials Co., Ltd. certification
China Anhui Huifeng New Synthetic Materials Co., Ltd. certification
Customer Reviews
HCNS team is trustworthy, I have a project that needs Geocells, they offer me the right Geocell type and send free samples to us, after checking their samples, we buy and do our project very perfectly. Once we have a project for Geocell in the future, we will definitely cooperate with you again.

—— Tony

I'm Online Chat Now

Mine Dump Slope Geocell 100mm GM356 HDPE Topsoil Cover for Rehabilitation

Mine Dump Slope Geocell 100mm GM356 HDPE Topsoil Cover for Rehabilitation
Mine Dump Slope Geocell 100mm GM356 HDPE Topsoil Cover for Rehabilitation

Large Image :  Mine Dump Slope Geocell 100mm GM356 HDPE Topsoil Cover for Rehabilitation

Product Details:
Place of Origin: ANHUI CHINA
Brand Name: GeoMax
Certification: ISO9001-2015
Model Number: GM356-100
Payment & Shipping Terms:
Minimum Order Quantity: 1000 ㎡
Price: Negotiation
Packaging Details: Folded sections wrapped in film, on pallets or as requested
Delivery Time: 10-20 days
Payment Terms: T/T, L/C
Supply Ability: 3000㎡ per day

Mine Dump Slope Geocell 100mm GM356 HDPE Topsoil Cover for Rehabilitation

Description
Strip Thickness: 1.5 Mm Free Sample: Free, Courier Paid By Buyer
Joint Type: Welded Seams Application: Slope Protection And Erosion Control
Resin: HDPE Depth Of Cell: 100 Mm
Section Area: 18.0 M² Per Section Section Size: 2.35 X 7.65 M
Weld Spacing: 356 Mm Min. Order Quantity: 1,000 M²
Highlight:

HDPE geocell 100mm

,

geocell mine dump slope

,

HDPE geocell topsoil cover

Mine Dump Slope Geocell 100mm GM356 HDPE Topsoil Cover for Rehabilitation

Mine dumps and spoil heaps must be covered and greened after operations. A 100 mm GM356 geocell keeps the new topsoil from sliding off the slope.

This geocell panel is made from 1.5 mm HDPE strips welded every 356 mm. Expanded, one GM356-100 geocell section measures 2.35 x 7.65 m and covers 18.0 m², with 100 mm deep cells of about 260 x 225 mm.

GM356-100 Geocell Specifications

Property GM356 HDPE Geocell
Model GM356-100
Density 0.935–0.965 g/cm³ (ASTM D 1505)
Surface Textured, perforated (10 mm holes, < 12% of wall area)
Weld Peel Strength ≥ 14.2 kN/m (USACE GL-86-19)
Coverage per Section 18.0 m²
Expanded Section 2.35 x 7.65 m (9 x 34 cells)
Strip Tensile Strength ≥ 22 kN/m (ASTM D 638)
Welding Spacing 356 mm
Color Black; green, yellow or tan on request
Strip Thickness 1.5 mm ±5% (ASTM D 5199)
Material HDPE, carbon black ≥ 2.0% (ASTM D 1603)
Cell Depth 100 mm
Open Cell Size 260 x 225 mm

GM356 HDPE geocell 100mm detail
Close-up of GeoMax HDPE geocell: textured, perforated cell walls

Product Advantages

  • Textured, perforated strips: Every strip is textured and perforated with 10 mm holes (less than 12% of the wall area), so water drains between the cells.
  • Strong welded seams: Seam peel strength is at least 14.2 kN/m (USACE GL-86-19); strip tensile strength is at least 22 kN/m (ASTM D 638).
  • Quality documents: CE verification to EN 13251:2016 issued by ICR; factory certified to ISO 9001, ISO 14001 and ISO 45001.
  • Easy to ship and install: Sections are folded flat for transport and open by hand on site, with no special equipment.
  • Made to order: Weld distance from 254 to 712 mm, cell depth from 50 to 300 mm, and black, green, yellow or tan strips.

Typical Applications

Geocell helps hold a thin topsoil layer on rehabilitated mine slopes until plants take over. The geocell walls confine the infill so it does not spread sideways under load.

  • Topsoil retention on mining and landfill slopes
  • Embankment cover and revegetation
  • Erosion control on new fill slopes
  • Cut and fill slope protection on highways and railways

Installation Guide

  1. Trim the slope face to an even surface and remove loose material.
  2. Anchor the top edge of the geocell in a trench at the crest of the slope.
  3. Expand the geocell down the slope and fix it with stakes or anchors.
  4. Join the geocell sections side by side with staples, cable ties or connectors.
  5. Fill the cells with topsoil or gravel from the top down, then seed or plant.

Choosing the Cell Size

GM356 has a 356 mm weld distance, one of our smaller cell sizes. Small cells hold infill well on steeper slopes and under wheel loads. The same model is made in other depths from 50 to 300 mm.

HDPE geocell GM356 slope
Close-up of HDPE geocell cells

Packing, MOQ and Lead Time

Each folded section is film-wrapped; pallets or loose loading as requested. Minimum order 1,000 m², with smaller trial orders open for discussion. Delivery takes 10–20 days and daily capacity is 3,000 m². Free sample, courier paid by the buyer.

Who We Are

GeoMax is the brand of Anhui Huifeng New Synthetic Materials Co., Ltd. We have made geocell in our own factory in China since 2006 and export to more than 40 countries.

Frequently Asked Questions

Q: Do I need anchors on the slope?
A: Yes. The geocell is anchored at the crest and fixed with stakes or anchors down the slope; spacing depends on slope angle and length.

Q: Can I get a sample?
A: Yes, a free sample is available; the buyer pays the courier.

Q: How is the geocell packed?
A: Folded sections are wrapped in film and loaded on pallets or as requested.

Q: What is the MOQ and lead time?
A: MOQ is 1,000 m² (smaller trial orders can be discussed). Delivery is 10–20 days; capacity is 3,000 m² per day.

For a quotation, share your project drawing or the cell depth, weld distance and area; we will suggest a suitable size.

Contact Details
Anhui Huifeng New Synthetic Materials Co., Ltd.

Contact Person: Ms. Xu

Tel: +86 13966660061

Send your inquiry directly to us (0 / 3000)